When developing new types of in-ear silicone shells, Sonova previously had to accept waiting times of up to six weeks for new prototypes. With Injex' additive tooling process, this time has now be reduced to a few days.

The two startups 2point Engineering and Injex collaborated on the development of a portable cooling vest. Using additively manufactured tooling, Injex first carried out a material test for laser welding trials and then manufactured a small series of 200 in injection molding.